TRAFFIC ADVISORY — Utility Construction
Roads Affected: W Linebaugh Ave (N Newport Ave - N Willow Ave)
Dates: February 26, 2024– September 30, 2024
Time: Daily (9 am – 4 pm)
TRAFFIC ADVISORY — Utility Construction
Roads Affected: W Linebaugh Ave (N Newport Ave - N Willow Ave)
Dates: February 26, 2024– September 30, 2024
Time: Daily (9 am – 4 pm)
TRAFFIC ADVISORY – Road Construction
Roads Affected:
TRAFFIC ADVISORY —Roadway Construction
Roads Affected: N 15th St (E 109th Ave – E Fowler Ave)
Dates: June 3, 2024, to June 17, 2024
Time: Daily (9am - 4pm)
TRAFFIC ADVISORY — Utility Construction
Roads Affected: N Howard Ave (W Grace St- W Nassau St)
Dates: April 8th, 2024 to June 4th, 2024
Time: Daily (9 am- 4 pm)
Beginning at 9pm tonight, the outside westbound lane and the inside eastbound lane on West Sligh Avenue will close between Anderson Road and Conaty Drive while the Tampa Water Department conducts maintenance on the water distribution system.
Due to more extensive work needed, the southbound lane of South MacDill Avenue will remain closed between West Euclid Avenue and West Bay Villa Avenue while the Tampa Water Department repairs a water main break.
TRAFFIC ADVISORY -- Roadway Construction
Roads Affected: Nuccio Pkwy (E Palm Ave – E Scott Dr)
Dates: May 27, 2024 to June 3, 2024
Time: Daily 9 am - 4 pm
Closure Type: Southbound Lane Closure
On May 29 at 9 am, Wastewater Department crews are closing N 15th St between E Fowler Ave and E 109th Ave to repair manholes in the area. Signage and traffic control devices will be on-site to assist with rerouting and traffic flow.
Roadways Affected: N. Habana Ave from W. Columbus Dr to W. Leroy St, N. Bound Lane Continuous Closure
Dates: May 24, 2024 – July 31, 2024
Time: Daily Continuous
Closure Type: North Bound Lane Closure
All lanes of North 15th Street will be closed between East Louise Avenue and East 31st Avenue while the Tampa Water Department continues to work on a more extensive repair following earlier work to repair a water main break.